Brief
The Prague branch of the Globus store approached us with a request to ensure an uninterrupted water supply during a planned shutdown.
Specific challenges
In this case, the client required a stable system that would ensure an uninterrupted water supply connected to the local infrastructure. In such cases, a quick and effective solution is essential, as there is often little time for preparation.
Solution
We installed a water containment bladder certified for drinking water together with a pump on site. This allowed us to connect our solution to the client’s existing system and ensure that there would be no interruption in the water supply even during the planned shutdown. Due to the high capacity of the material, we were able to respond quickly and dispatch technicians almost immediately. This allowed the facility to remain open despite the water outage.
Key outcomes
- We prepared a quick and functional solution for the client, allowing them to remain open despite the water outage.
- We minimized costs without impacting the quality of the service provided.