Brief
The Azyl78 summer theater approached us with a request to connect the facilities being set up for performers—five containers with showers and toilets. The solution had to be operational for the entire four-month season in a location where the nearest sewer system was nearly 300 meters away.
Specific challenges
For long-term operation, it was necessary to create a solution that would be sufficiently robust and trouble-free. The second challenge was the distance from the sewer system – the nearest drain was 300 meters away.
All this had to be solved at the lowest possible cost while maintaining the quality of the service provided.
Solution
We installed our most powerful pumping stations on site and connected the pipes to the local sewer system. At the same time, we distributed the water supply so that all five consumption devices could be connected from a single source. After connecting the containers to the water and waste systems, we tested everything and handed it over to the client for use. For the next 4 months, our team was always ready to go out and service or replace the technology on call.
By connecting to the existing infrastructure, i.e., the sewer system and water connection, we eliminated the need to transport water by truck, thereby reducing the client’s costs and overall environmental impact.
Key outputs
- We transported waste 300 meters away
- Our equipment operated without malfunction for 4 months
- We minimized costs without impacting the quality of the service provided
- We were always available for servicing